skip to content

Department of Engineering - Building Projects

 
Finished Lab
Garage Opening Oatley Family

Oatley Projects Garage

A generous donation from Geoff and Jean Oatley and family allowed the Department to build the Oatley Projects Garage , a dedicated garage space on the main site for two of the student-led projects, Cambridge Eco Racing and Full Blue Racing . Prior to the provision of this area, student projects had...

Read more

Archives montage.jpg

Baker Basement Archives

When the library was refurbished during the Summer of 2015, as part of the Dyson Centre Project, it was necessary to create a temporary home for the library's collection while construction work took place. An on-site location was preferred to allow on-going access to the collection during the works...

Read more

Finished Lab 2

Fluid Dynamics Lab

Formerly known as the Hydraulics Laboratory, this double height research space, located within the Inglis Building, had developed in an ad-hoc way over a number of years, resulting in less than optimal space utilization. A project to remodel and rationalize the space, along with expansion into an...

Read more

EEDBA Clean Rooms

The Cambridge Graphene Centre (CGC) clean room complex was omitted from the original Electrical Engineering Annexe project due to budget constraints, and the area was completed only as a shell. Clarification of user requirements, and the allocation of EPSRC research funding allowed the work to...

Read more

Building Projects Helpdesk

To report any unexpected noise or disturbance from work being undertaken as part of a building project, please contact the Building Projects team as follows:

01223 (3)32882

01223 (3)32800